paveoutline↗
The outdoor planning studio

A little more patio.
A lot less guesswork.

See how every paver fits before the first one goes down. A clear layout, an honest cut count, and a material list you can take outside.

Free to useNo accountFeet or metres
Your space, drawn to scale.

Start with a rectangle. Try two patterns. Take the plan with you — without uploading your measurements.

See exactly what we count ↗

01 Define your space

02 Choose your pavers

03 Materials & budget

¹ Editable volume examples, not recommended construction depths. Prices are your inputs, not market quotes. Currency labels do not convert prices.

Rectangle only · no borders, curves or obstacles. One stock paver per placed piece; offcuts are not reused.

YOUR PATIO / PLAN VIEW12 × 10 ft · running bond

Enable JavaScript to draw your patio. The method and examples below work without it.

Full paverCut paver
—Full pieces
—Cut pieces
—Extra spares
—Pavers to order

Patio area —

Edge length —

Material subtotal —

Base volume —

Sand volume —

Volumes at entered depth, before purchase bulking.

Cut-piece schedule · dimensions in mm
Finished length × width (mm)Pieces

Finished dimensions, not saw settings. CSV includes every placed piece.

Saving is optional and stays in this browser.

A good plan goes below the surface.

Keep planning
01 /

How many pavers?

Understand full pieces, perimeter cuts and the difference between coverage and an order.

Quantity guide ↗
02 /

What goes underneath?

Turn your own base and bedding depths into cubic metres or cubic yards.

Base & sand calculator ↗
03 /

Build a material budget.

Price actual stock pavers and separate volumes, without confusing a subtotal with a quote.

Cost calculator ↗
Measure twice, plan once

A drawing you can
read. Numbers you
can trace.

Our calculation method ↗

How to use the paver layout planner

  1. Enter the finished rectangular patio dimensions. Use actual paver face dimensions, not a nominal module that already includes joints.
  2. Choose stack bond or half-offset running bond. Joints are inserted between pavers; there is no extra perimeter gap.
  3. Read full and cut counts separately. A corner piece cut in two directions is still one piece. Export the SVG or individual-piece CSV.
  4. Add a spare allowance for breakage and future repairs. Enter base/sand depths and local supplier prices, then print your plan.

A simple check you can do by hand

A 4 m × 3 m rectangle using 200 × 100 mm pavers with zero joints in stack bond fits 20 columns × 30 rows = 600 full pieces. At 10% extra, order 660 pavers. A 100 mm entered base depth occupies 12 × 0.1 = 1.2 m³, before bulking or compaction adjustments.

What this plan does not do

No herringbone, L-shapes, slopes, borders, drains or obstacles. Cut pieces are rectangular intersections of the patio and the paver grid. We do not find the best starting point or reuse leftovers. Saw kerf is not modelled: cut sizes are finished face sizes and each cut piece starts from a separate stock paver. Your installer must verify that each cut is feasible.

US, Canadian and European conditions differ. This is a measuring and budgeting aid — not a guarantee of base suitability, load capacity, frost resistance or drainage. See volume assumptions and browser-local processing.